Skip to content

Inspections and deadlines

Inspector visits, warnings and the 14 days to fix, in one place.

ForFacility managerOwnerInspector

The problem

After an inspector's warning, an owner has 14 days to fix the fault. Missing the date can mean a fine.

How WFI helps

The Inspections page lists every warning with its deadline and days left, the repair status, and the record once it is ready.

Step by step

  1. 1

    Record a visit

    Press Record a visit and choose the building and the outcome. A warning on an alert starts its 14-day countdown.

  2. 2

    Watch the deadlines

    Warnings are sorted by the nearest deadline. Open a row to work on the alert.

    Inspections and deadlines: Watch the deadlines
  3. 3

    Share the record

    When the repair is proven, open the record and send its link to the inspector.

Try it yourself on the real screen.

Open Inspections

Sources

  • F1 From 21 March 2027 water lost from a ground or roof tank is fined SAR 5,000, then 10,000, then 50,000 per tank. A leak in inside pipes or irrigation: SAR 2,000, then 4,000, then 10,000. A warning comes first, with 14 days to fix. Individuals and small firms pay half. (Umm Al-Qura (official gazette), 14 Aug 2026)